Answer Posted / pankaj kumar goel
A temporary platform or system of platforms used for support; scaffolding.
2. The process or manner of putting on a play on the stage.
3. The act of jettisoning a stage of a multistage rocket.
4.
a. The operation of stagecoaches as an enterprise.
b. Travel by stagecoach.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
in 100 cft = 1350 bricks in 100 cft = ? bloks
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
why do we not deduct volume of steel to find actual volume of concrete in practical???
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
What are the advantages and disadvantages of lead products in construction?
what is flashing?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
what is pile and deam foundation
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?