why the tapping of transformer on ht side??????
Answer Posted / kornelius vattie
HV side of a transformer carries low current in comparison to the LV side of the same transformer. This low current promote little arcs during switching, limits the size of cables to be used, therefore it is also very economical to do tappings here. NB- the higher the Volts, the low the Amps.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
IF alternator SCR value will be high means what happen in alternator efficency at operating power factor of 0.8
In single phase ac ups supply when current is measured with tong tester neutral current is found more than phase current.What is the reason?
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.
Is the installation of the filter cloths necessary before spreading the gravels at the transformer yards?
can u describe the method used for protection of transmission line.
What is the effect of atmospheric pressure & Temp; on efficiency of motor? Why NGR(Neutral Grounding Resistor) is used in 132/11 KV Transformer & how? What is the use of Auto T/F in Grid Station?
How does a transformer contribute towards the widespread popularity of ac system over dc?
What is the main use of rotary phase converter ?
How can calculate the earthing strip of Copper/GI for rating of 30kV,discharge current 10KA Lightning arrester.
sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason
What are the specifications for getting approval of Substation?
hi frenz,its aswathy.i hve aplied for the hpcl test on feb,pls send the test patern & the placement papers as soon as possible. mail-id :kjaswathy@gmail.com
HI SIR, AM PREPARING FOR RRB FOR SECTION ENGINEER POST. PLZ SEND ME THE PREVIOUS QUESTION PAPERS AND HELP ME. I HAVE NO ENOUGH TIME MY EXAM DATE IS 22ND JUNE.... MY EMAIL ID IS nalla.amarnath@gmail.com