Answer Posted / waqar
you should calculate in R/M nt in m2
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what mean By core Billing
What happens to Load at yielding ?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
detailed calculation of the amount of cement used?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what radial pressure, the NP2 class rcc pipe can sustain?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
In cement concrete how to check a quality of material also proportion of material at site ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What is meant by autocad?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is the breaking strength of wall tiles
how to shuttering is used in slab