what are the CAD software versions you have used?
Answer Posted / amar
i have studied all autocad software , currently use 2007 its good version
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What was asked in isro civil interview
pls mail some more tecnical qustions at msaranya2610@gmail.com
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
how much quantity of cement,sand and water required for 1 sq feet flooring work .
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what is called the inverd level of mabhole chamber?
Discuss some applications of modular elasticity?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
procedure for preliminary selection of size of column of 5 storey building
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Which is the latest version of solidsworks?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,