Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1. What is difference between auto level & dumpy level?

Answer Posted / kanupriya

In dumpy level reading seen are inverted but in auto level reading are seen actual as staff seen from eye piece

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the layers of the national and heir aprox thickness??

2130


Explain the difference between shear and tensile strength.

1094


Formula for calculation volume of essentric footing

1819


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1990


How to calculate material and labor required for 100 m2 plaster?

1830


What are the uses of groynes?

1109


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2155


how much of the strength comes from post-production curing

2326


construction workers how much time take one work or qty

1814


what's the formula for calculate pcc for matt(45mm aggregate)?

2729


Why steel rods are produced only in even dimensions?

2608


What things architect have to take care of before starting any project?

1276


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1954


what is right & short method of measurement of slab&beam

2071


What is Critical path in Ms-Project ?

1194