what is the proportion of M25 geade cincrete.?
Answer Posted / anil katiyar
M25=1:1:2 (cement:sand:aggregate)
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what is Critical Path Method (C.P.M)?
What is Architect-Prepared Contract?
whaat is blister in box girder bridge and what is its function..
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
How to cal. The weight of hollow pipe?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
Why should pumping be not used in case of concreting works?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?