1 liter emulsion paint covered how much area?
Answer Posted / mohana rao
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
1 litre of paint = 1000 Cubic Centimetre (CC)
Volume = area * thickness
1 liter = 1000 cc (cubic centimeters) = 1000000 cubic mms
1 Micron = 1/1000 mm
100 microns = 0.1 mm
Area = 1000000/0.1
Area = 10000000 sq mms
Area = 10 sq meters
Also in British Units
2.54cm = 1 inc
1 metre = 100 cms
1metre =100/2.54 = 39.37 inch
Also 1 square metre = 1m x 1m = 39.37 inc X 39.37inc = 1549.9969 sq inch
12 inch = 1 foot
1 sq feet = 12 inc X 12 inc = 144 sq ft
1 sq metre = 1549.9969 sq inch = 1549.9969 / 144 = 10.76 sq ft
So 1 litre of paint can cover an area = 10 sq meters =10 x metre x metre
= 10 x 10.76 sq ft = 107.6 sq ft
Finally one litre of paint can spread with a brush with 100 micro thickness
either 10 sq metre or 107 sq feet
Practically take it @ 90% calculation value because of various factors
| Is This Answer Correct ? | 41 Yes | 4 No |
Post New Answer View All Answers
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what will be price of 1:2:4pcc per kg?
What is meant by Crystal Concrete?
What are the techniques to measure road difference?
what is polity
Describe the role of independent Quantity surveyor?
What is the strength of 1:6:12 mix?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
what is the water-cement ratio of mix design while 30mpa in 7 days?
What was asked in isro civil interview
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..