Answer Posted / roop kumar
To identify the phases in switch yard / line and to synchronize the system
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
what is laser diodes?
How Diesel Generator start ?
What's the difference between non break power supply and non break non short break power supply
How can we design a HVAC Plant room which includes AHU,FCU,Chillers,Cooling towers, Pumps etc & how will they work? any Drawing if possible?
what is differnce btwen lll and lllg faults
can anybody send the rrb chennai &rrb bopal question papers of 2006&2007.My exam is on 12 oct 2008.Its urgent
How short circuit MVA(Fault MVA) in a power system calculated for calculating number of earth plates ?
What are the protection required for Transformer, motor, Line, Generator, capacitor, that all i have to refer which standard?(Like Transformer detail IS 2026)
I want formula to calculate cable size as per load given in length & amp. I searched many sites but didn't right answer. Please reply me asap.
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
How to calculate that clean water supply in one Day from 150 KLD STP?
why a tester wont shock while testing the power in house
Define availability (operational)?
Define delay time.