Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??

Answer Posted / ram mahidhar reddy

Camber is nothing but slope
It mean that a slope of 15 mm should be provided across it's length

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S

1993


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

2282


Explain the mechanism of cavitations in pipes and drains?

1107


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1840


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2260


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

2313


List out some of the common problems that architect have to tackle it?

1073


How to design staircase.plz tell me formula for the design the staircase.

1952


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

2249


construction workers how much time take one work or qty

1810


what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete

4339


what is meant by shear center?????

2610


How many % we consider for lap for reinforcement for estimates

1809


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

2073


what is the most suitable foundation when construct a bird watching tower in a marshy land

1853