Answer Posted / ram mahidhar reddy
It can be done by applying water proofing material as a membrane ,
Or
It can be prevented by filling a water proofing slurry
Or
It can also be prevented by placing a layer of tiles (materials that are not allowing water to pass through it )
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Who built the sears tower?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is meant by scaffolding coefficient?
Explain what is alternate bid?
What is the zero value in quantity surveying
what is the method used for marking of cantilevers in hirise buildings by using theodolite
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
What is the software used in civil engineering?
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
What are the advantages and disadvantages of lead products in construction?
how to identify the failure of building by expansive soils
What is the coeffiencent Friction Angle between Steel and Ashphalt?
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
How to calculate construction cost of residential building in mumbai