Answer Posted / svmanojkumar2580@gmail.com
1. A temporary working platform against or within a building for construction, repairs, or demolition.
2. A temporary working platform supported by the temporary timbers in a trench
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How to calculate brick work quantity?? Block work quantity??
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
what is the weight of 12mm aggregates?
can you provide a link for manual design of building?
construction workers how much time take one work or qty
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
How many square meter can a worker/labor demolish a structure per day?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
How many square meter can mason layout chb per hour
how to prepare site mix design
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.