why CT ratio stand for 50/5, 100/5, 25/5.
Answer Posted / yash
CT- Current transformer basically design for metering and sensing purpose .and KWH meter basically design for capacity around 5 A . So CT always available in ratio 5 A.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
what is 3rd Harmonics? how it is generated in alternator
IF % IMPEDANCE OF A TRANSFORMER IS INCREASED FROM 5.8% TO 8% HOW MUCH THE EFFICIENCY OF THE TRANSFORMER WILL COME DOWN?
Saving in copper achieved by converting a 2 winding transformer in to an auto transformer is determined by A voltage transformation ratio B load on secondary C quality of core material D size of transformer core
Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?
what is basic difference betmeen normal & flame proof motor??
What is Percentage impedence of a transformer? why it is expressed at a percentage? what is the importance of percentage impedence in case of a transformer?
what is the synchronous timer ? and it applications.
What is Traction? 1KVA Alternator, How much urrent taken?
Where should the lighting arrestor be placed in distribution lines?
How energy is generated in hydroelectric power plant?
What is electrical grounding?
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.
How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?
What is a differential amplifier? Also, explain cmrr.