If a Page is having 5 Links and there are 5 users and each
user is clicking on one link. How can we achieve it in
Loadrunner.
Answer Posted / chandra sekhar.k
IN Parameterize the 5 links with sequential each iteration, TO So that each Vuser Picks one link sequentially and executes further or it more information if want call 09611678545
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is wasted time in vugen replay log?
What is the purpose of selecting ‘show browser’ during replay in the general options settings?
When loadrunner is used?
What is the vuser in the scenario?
How vugen create a vuser script?
What is the configuration of systems when using load runner?
How do you decide the number of load generator machine required to run a test?
Hi all, I am new to Load Runner. I have run the load runner and i got analyzed reports/graphs. But i am very much confused about how to analyze those graphs. Can any one help me out this problem?
What is parameterizion?
What are all the components of loadrunner?
What is report viewer?
How can correlation be performed?
What type of function generate and insert by the vugen to the script when you record a script?
Which are online monitors and windows resource monitors
What is lr_output_message?