Answer Posted / vikas
MIN.12 MMDIA
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Which brick is best for construction ,either fly ash or AAC BLOCKS
What is difference between code and standard and specification?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is labor and material payment bond?
How does siphoning work?
150mm bricks size how many use 4.14 m3
what is anchorage length,lap length and (dont remember the last one)
Explain the design for rcc multi-storied building?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is braced excavation all about?