how many bricks are requir for one unit ho we will caculate
Answer Posted / krishna
700 (or) 728
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What are your goals?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is the sugested procedure of water purification for public supply?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Forces in a Shear Wall are in plane or out of plane ?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard