how many bricks are requir for one unit ho we will caculate
Answer Posted / krishna
700 (or) 728
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Why we provide hair pin for shed
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is a bearing capacity of soil?
What is rate of concrete surface rendering work per sqm
Explain what are the skills required to become an architect?
use ofr concrete as per grade ?
what is the weight of 10mm,20mm,40mm aggregate
How much quantity of rod binding work by a rod binder per day
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Define What are the uses of Groynes?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
What is progress payment?