for assembly supported beam main bar are provided at ?
Answer Posted / vittalanand
bottom above 1.5 times dis of main bar as cover
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
List out some of the checking’s, done at the completion of construction?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
Volume of 25kg putty bag & 40 kg putty bag volume??
Which stone is best for wall construction Laterite Stone or Cement Blocks
Describe the various methods of concrete curing?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
Define relative co-ordinates?
what will be price of 1:2:4pcc per kg?
How do you prepare Material Recovery Statement for deduction from contractors bills?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
How much cement is require in one sqft area in a G+3 residential construction.
How can you distinguish between sorption, absorption and adsorption?
Why concrete barriers have curved surface profiles?