Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye
Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
Answer Posted / imitiyaz ghouri
when you add
cement+fine aggregate + course aggregate = 1.54 cum
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What are new methods /technologies of pothole patching?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
what is civil enginnering & what you need of this course?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
whou haat goals do you have in your career
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
(Project Management Topic) What are the important criteria in the successful realization of the project?
how to find hardness of water?why it should be determined?
how to tie 10 legged stirrups
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
how is the reinforcement is distributed in triangular slab
What are the alternate material for steel, Sand and aggregate
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required