Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the OMC and MDD for subgrade (soil),Granular Sub
Base, wet Mix Macadam in your project?

Answer Posted / shailendra kumar

i want to know that the mdd or omc of the wmm material in laborboratory should verry +/-,,at average density

Is This Answer Correct ?    1 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Wat is meant by Aecron brick?

2066


how much cement sand n bricks required in im3?and how much in plaster?

2543


How to calculate the crank rod in slab

2426


What is Refuse Area In High Rise Building ?

2164


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1761


How to calculate quanty of steel in four leg stirrups?

1934


How can you produce desired alloys and discuss their applications in daily life.

1213


what is the hanekom repairing material after concreting work

2406


how to do sudoko puzaals?

2270


Define What is the force exerted by the Tacoma narrows bridge?

1150


What is the worlds largest concrete dam?

1242


Define What is the origin of name Railway Sleepers?

1278


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

2063


Explain why concrete barriers have curved surface profiles?

1243


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1934