Hi, Please tell me the ISI specification for the duration
of concrete to achieve full strength of concrete. Is it
28days?
Answer Posted / kapil gupta
100% in 28 days.
60-70% in 7 days.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Calculation of Pier Cap with tapper area?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
What are the RISKS during the project construction?
Define What is unit weight of normal concrete?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how to calculate the length diamond shaped striupps in column
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is proportion of PCC Grade G?
what r you reqired for concrete baching plant?