Answer Posted / sonal
Super BOM is created in Variant configuration for a configurable material. It consists of list of all components required for all variants of the material. Selection of components in a production order depends on the characteristic selection in Sales order and object dependencies.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Can’t one material be assigned to more than one operation in a routine?
What is meant by payscale structure? How did you configure the payscale structure?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Can we create production order without bom and routing ?
What is Production scheduling Profile and use of it?
Explain what happens to planned after it has been converted into production order?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
How the processing time is calculated in a wc when both labor, machine categories exist?
Explain the stock requirement list and their uses.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
How did you configure the payscale structure?
Explain what is routing in sap pp?
what do you mean by planning time horizon
Integration between PP and MM Module.
How is time management and payroll is integrated?