How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / ajay padma
494 nos
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
why building got air crack? if it get in one particular are what is means?
why do we provide haunches in rcc box or underpasses?
yasser arfatcompleted his degree in civil from which university
How many bricks are there in 100cft?
What is bylayer?
what are the Task work of different labour.?
Form where IS456 is adopted in 1978?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
How to calculate canal slope curvature qty!
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What is the difference between engineering stress and true stress?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)