In site how we can identify one way slab and two way slab?
Answer Posted / arun
The ratio b/w long span to short span values decides the type of slab...IF (Ly / Lx )<or =2 it is two way slab otherwise it is one way slab..
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the significance of cost estimate knowledge for an architect?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Which ratio use for cement selery???
How to marking the building
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
why are you joining in this (applied post) job and your aim for this job
How can we demolish concrete beams?
How to decide/consider the grade of bitumen for dbm.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
How many % we consider for lap for reinforcement for estimates
Spider cracks occur in beam bottom due to––
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...