when we calculate concrete volume in footing the column along with footing up to the ground level is also taken or not ?
Answer Posted / jahul
No,Only footing quantity will be measured....
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how much shouid be the rate for ready mix concrete per cubic meter
In a concrete grade C35A, C & A stands for what and equalent cube strength?
length where bent up is made in slab of bridge from one end
How to calculate woden area in sft and Cft
what post do you prefer to work in this company and why do you think you can serve better in such position?
What is specific gravity???
cement and sand required for one block of size 0.23*0.15*0.46
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How many types of slabs are there & how to design it?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
yasser arfatcompleted his degree in civil from which university
What are the alternate material for steel, Sand and aggregate
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
Write short note on construction programme for pile foundation.
List out some of the common problems that architect have to tackle it?