what do you mean by the "bay" in a switchyard?
how to determine exact number of bays in a substation?
Answer Posted / satya
basically it consist 5 devices
1.line isolator
2.circuit breaker
3.earth switch
4.CT
5.PT
etc
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
What is Servo Ventilated Motor?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
IF alternator SCR value will be high means what happen in alternator efficency at operating power factor of 0.8
Why syn. Generators are used for the production of electricity?
What is the implications when 600 hp motor is started when the unit is running with Transformer of capacity 1500 KVA and DG set of 1000kva
What is the resistance of the field winding of a d.c. Shunt generator kept low?
How to calculate earth wire load by formula
condition Autotrip facia come on control panel of electrical transmission line?
I AM A ELECTRICAL PANEL BOARD DESIGN ENGINEER.IF I GO ANY INTERVIEW ,TECHNICALLY WHAT ARE QUESTIONS I WILL FACE FROM INTERVIEWER?
how to prepare the technical test
why the carbon brushes are broken in srim while the motor runningtime
How to calculate fault level of 11 KV system
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?
we need a ntpc previous papers
what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.