Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do you mean by the "bay" in a switchyard?
how to determine exact number of bays in a substation?

Answer Posted / satya

basically it consist 5 devices
1.line isolator
2.circuit breaker
3.earth switch
4.CT
5.PT
etc

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Servo Ventilated Motor?

1988


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1796


IF alternator SCR value will be high means what happen in alternator efficency at operating power factor of 0.8

3813


Why syn. Generators are used for the production of electricity?

1082


What is the implications when 600 hp motor is started when the unit is running with Transformer of capacity 1500 KVA and DG set of 1000kva

2153


What is the resistance of the field winding of a d.c. Shunt generator kept low?

1055


How to calculate earth wire load by formula

2517


condition Autotrip facia come on control panel of electrical transmission line?

1518


I AM A ELECTRICAL PANEL BOARD DESIGN ENGINEER.IF I GO ANY INTERVIEW ,TECHNICALLY WHAT ARE QUESTIONS I WILL FACE FROM INTERVIEWER?

12805


how to prepare the technical test

2039


why the carbon brushes are broken in srim while the motor runningtime

1635


How to calculate fault level of 11 KV system

2020


why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?

1814


we need a ntpc previous papers

1876


what is the minimum pay scale for electrical engineer (building construction)in kuwait? plz revert back with yrs of experience & pay scale respectively.

2102