State the type of roads and compare the advantages and disadvantages?

Answer Posted / senthil473

most commonly 2 types of pavements are used,
1) rigid-pcc
2)flexible-bitumen

1) rigid pavements, ie. pcc, is costly. they require low maintenance, the construction speed is very slow.
2)flexible pavements, ie. bitumen, is low cost as compared to rigid pavements. they requires periodical maintenance, the construction speed is faster as compared to pcc road construction.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

2607


Define line type?

682


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1417


how to design and calculate materail quantity for concrete speedbreaker ?

5392


give me the rate analysis for Bituminous Macadam and SDBC

6953






what is the price of a cubic meter of concrete on international market?

644


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1496


List out the types of roofs?

681


what is parametre for M25 after 7 days strength

1527


What is the difference between chamfer and fillet?

798


Slab quantity 

1616


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

1818


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1548


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2601


how to calculate the concrete mix m30 by volume

1101