Answer Posted / dharambir sobha
P=plane
C=cement
C=concrete
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is the difference between linear dimension and aligned dimension?
Why joints are provided?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
though u r a civil engineer, y r u interested in tcs???
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
sir how can we find the cement and sand required for making 4" drop
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how we calculate the grade of the Bituminous materials.?????
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What will be weight of 0.5mm GI sheet per sq.ft?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
Explain the Strength of brick?