How much will be Concrete required for one Sq.meter of area for building work?
Answer Posted / jaydeep
411.05 kg
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
can you provide a link for manual design of building?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
how much repeitation for conventional and maivan formwork?
natucher of concrete &type of concrete?
What is absolute pressure? How absolute pressure is calculated?
How to find beam R/F cutting length
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
I need model question papers for writing the Dubai municipality exam,for G+1
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Why are steel plates inserted inside bearings in elastomeric bearing?
In cement concrete how to check a quality of material also proportion of material at site ?
Define What is the meaning of a blue land surveyors flag?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Define current ucs?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer