Hello friends i need check lists of different instruments
during the Erection and commissioning in thermal power
plant.Please help me.My Mail id is
naba02222@gmail.com/naba02222@rediffmail.com
Thanks
Nabakishore Biswal
Answer Posted / jeff hawley
Call MMR ProCom at US ( 832-237-9800) and ask for Job assistance with specific device(s) information and quanities and we would be happy to help you
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
wich is coming the first HAZOP OR SIL
why would you like to join our company
In bently nevada vibration monitoring system,what is the reason to maintain the Resistance of the probe + extension cable equal to 95 ohm? If possible explain the basic principle of measurement with detail electronic circuits.
detail of mass flow meter pricipal
full process of gas turbin?
what is installation and commissioning of (fat & sat) of power plant dcs ? this question keeps in desirable conditions of one company .
what is the responsibility of an instrument commissioning supervisor
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
IS there any effect of vortex in low pressure side of the transmiter after the orific in feed water line? if yes then what is the calculation?
Why flow/pressure transmitter before control valve?
how do calibrate the valves.. with clear manual
what is the imbustion control loop
Explain about the leakage class of the control valves
what are the different types of Protocols? & their applications.
on interface level transmitter model(RTG3302-EMERSON) What is threshold valve how can we select correct threshold value T1,T2,T3,T4 When interface water & hydro carbon