Do your single-level BOMs represent production levels and do
you keep your BOM header materials in stock? If not, do you
produce non-stock items, or are some assemblies just used as
structural elements in a BOM?
Answer Posted / arun k
phontom assembly - i will create bom as gear box assembly but these contains gears but physically that gear box assembly is not there , it is called phontom assembly
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is scheduling
What is Backflush, the places where the backflush is used?
Differentiate ‘variant bom’ from ‘multiple bom’?
Control keys
Explain what is the need of mrp list if the stock requirement list is already given?
what is alternative item group
Special Procurement type 40 – proc. form alt. plant
What is meant by payscale structure? How did you configure payscale structure?
Explain PI sheet.
What is the planning horizon?
What is purpose of schedule margin key?
How to attach a drawing for a material to bom ? Is it possible ?
Where we have to specify the teardown time in one operation?
Mention what is the difference between stock transport order and stock transfer order?
what do you mean by planning time fence