If process order is technically closed, by mistake
I want to process that order again can I do it?
Answer Posted / arun k
If order is in teco status , then this order is irrelevant to mrp , all purchase requisation and planned order is cancelled for that order and capacity also cancelled for that order, first you need to do the revoke teco and process it
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the different type of BOM usage?
define variable cost
Define stock requirement
Explain the stock requirement list and their uses.
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
what do you mean by opening periods
SPRO path for order, confirmation or requirement class.
Explain source inspection.
Integration between PP and PM module.
Mention what is the use of t-code cs20 in bom?
what do you mean by planning time fence
Both labor and machine categories exist. How would you calculate the process time?
What is the t-code for changing production order and to display production order?
What is planned consumption and unplanned consumption?
How to insert an inspection checkpoint at the end of an operation?