after applying C-License in how many days we get it?

Answer Posted / ayyagari

in Tamil nadu you get withih 4 weeks

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

during installation time of transformer and alternator which points we have to observed?

1498


What are the two basic types of transformers?

641


what are the difference between PLC and embedded

1664


Pls explan the OLR setting in VCB at HT yard

2228


Explain Continuous and Discrete signals?

1309






The power supplied to a 50mH inductor from a 120V, 60Hz source will be

4259


How to calculate Number of Earthing Pits....???

1142


Can u explain : what is supply for train (whether a,c or d.c ).I know that supply is 25000v a.c .But there is rumour that supply is D.C. And also explain how lights and fans inside the trains are working ,and what type of motors are used in trains whether D.C motors or induction motors .If d.c motor, how it gets supply.If traction motors are used then what are traction motors and its functions and how it differs from other motors and also explain about locomotive . y d.c series motor in train.train wheels r driven by D.C shunt motor ,at what voltage,and at what speed. please reply..............

1394


WHY BLADE & JOW OF ISOLETOR IN SUBSTATION?

3919


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

1713


if field breaker of generator is closed prior to its rated speed on a power generating unit. what will be the effect on generator, unit transformer and starting transformer.

1310


number of I/O devices in siemense plc

1657


1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?

2317


hai now i am working as a electrical design engineer in construction field can i get a job in oil and gass field or power plant project as a electrical design engineer?

1478


how to find number of run cable laying[LT side] for transformer & alternator secondary side? [above condition for getting output power transformer to main panel side] give the example.

1609