give the full form for upvc pipe & cpvc pipe
Answer Posted / aman gupta
PPR Pipes
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What do you understand by “preset” during the installation process of bridge bearings?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
how much shouid be the rate for ready mix concrete per cubic meter
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how to caliculate required amount of cement and sand required for 1cu.m.
How many lbs are there in a yard?
Specific gravity of cement?
Is there the dry coefficient of cement is constant?
How to calculate construction cost of residential building in mumbai
what is labour consume factor in residential projects
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.