Answer Posted / kumar
1. Standard SOP
2.Flexible planning
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How to insert an inspection checkpoint at the end of an operation?
In the monthly lot size proc, how to generate lot at the end of Period?
What is opening period?
Explain what happens to plan after it has been converted into production order?
How costing is affected the pp?
What is testing & explain standard testing
What do we do in the realization phase?
What is Material status and which view of the material master it is available?
What is pi sheet
What are basic dates?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Define gaps.
What is the use of t-code cs20 in bom?
What is Backflush, the places where the backflush is used?
In lsmw which is most important step?