Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to sort an array in descending in RPG

Answer Posted / ravi kumar

DARR1 S 3S 0 DIM(5) DESCEND
C
C EVAL Arr1(1) = 100
C EVAL Arr1(2) = 500
C EVAL Arr1(3) = 300
C EVAL Arr1(4) = 400
C EVAL Arr1(5) = 250
C sorta arr1
C ARR1(1) DSPLY
C ARR1(2) DSPLY
C ARR1(3) DSPLY
C ARR1(4) DSPLY
C ARR1(5) DSPLY
C SETON lR

OUTPUT:
500
400
300
250
100

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what was the robotech rpg?

1210


how do I declare a table or array in rpg iv?

1184


what is kids-rpg?

1127


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2255


how do I play {insert rpg system here}?

1037


which program rpg or cl is efficent to update a transaction onto a database file and why ?

1243


can you debug ile rpg program using isdb?

1272


How can we know running job is batch or interactive?

1125


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1731


what is the necessary keyword needed to scroll subfile records?

1161


how does the rpg element work?

1236


what is a rpg?

1198


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2524


What is the difference between iter and do?

1213


if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.

2641