How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / arunprakash.g
brick : 500 nos
cement : 1.75 bags
sand : 0.26 units
mason : 1 mason
mazdoor : 1 men , 1 women
water : 2% of total cost.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is high type road and low type roads
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Why concrete barriers have curved surface profiles?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
it is possiblee to produce concrete with out cracks...
What is the snap size in civil and how can we create it?
Explain moment of inertia and its importance.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
Soil bearing capacity formula
how to caliculate required amount of cement and sand required for 1cu.m.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.