Answer Posted / bravo
Cascade control is having two controllers,one as primary and the other as secondary to increase the effective and accuracy of your control system
N:B the output of the primary controller is the setpoint of the secondary
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
1)How many tpes of vibration probe and how many tpyes of vibration. 2)how we can calibrate a vibration probe with tk3 3)what is RMS value in vibration measuring application and how we calculate it.
How INtools is useful for routine Instrument maintenance?
what is sliding spool valves?
How to Calibrate Ultrasonic flow Transmitter in Field
Derive capacitance to 4-20ma conversion formula / relation in capacitance type pressure sensor?
Calibration procedure for Electro magnetic Flow meter
please send the sample qustion paper for iocl written test ..
how to calculate control valve bonnet size?? or how to select its material?
What is megering????
1. For Steam drum level signal, why do we compensate with drum pressure signal? 2.For main steam Flow signal is comensated with main steam temperature signal and main steam pressure signal why?
what is the difference between active & reactive power?
Exothermic reaction./ endothermic reaction
Differentiate between ultrasonic flowmeter and radar type flow meter
how to calibrate load cell
where are following valves are applicable to install. can any valve be installed any line. globe valve butterfly valve boll valve gate valve