Answer Posted / bravo
Cascade control is having two controllers,one as primary and the other as secondary to increase the effective and accuracy of your control system
N:B the output of the primary controller is the setpoint of the secondary
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is difference between radial vibration and axial vibration explain in detail .
can anyone can let me know in Eurotron Micro cal 2+ calibrator in milli amps source mode we are not able to get 20 milli amps output it only produces 1.52 milli amps out, but display shows increase in milli amps , and err6 displays, let me know how to remove the err 6.
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.
WHAT IS THE CAM POSITION IN CONTROL VALVE POSITIONER ? WHY IT IS USED?
what are the diff. in servo and regulatory control?
what is the criteria to decide conductor size of a cable ?
Can anyone convert a 5/2 way or 3/2 way valve into an ISO valve?
WHAT ARE THE INSTRUMENTAL DIAGRAMSOF VALVES?
while i check zero check for dp flow transmitter some fluctuating came (0 to 458 kg/h) what is the reason?
How hart protocol can be connected with control valves?
the whole paper was based on Transducers..questions like define repeatability, error,accuracy,precision..den there were many q. on the conversion of Pa to mmHg and other units.. also..der wer few Q. on some level sensors(with diagram)
Can anybody tell me how to select the size of earthing cable for DCS & PLC system.Please tell me any relevant answer here or mail it to me.
What is loop1 and loop2 in MTS LT?
what is function of SCADA , and how is it work, explain with difination
all types instrumentation questions want