Answer Posted / narayan
Raft thickness-top and bottom cover-top reinfo-bottom main reinfo
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
how do you stabilize a waterlogged area in road construction
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
how much tempareture are required to make liquid state of pid leed
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
Define What is the force exerted by the Tacoma narrows bridge?
how to prepare site mix design
why we are useing plastic under the lean concrete?and whts the advantage?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
how to stop beam concrete between column
What glue is least sticky?
Test procedure of fly ash bricks as per code ?
Which is the best book for building construction?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.