Why we test compressive strength after 28 days..?
Answer Posted / mr
In general concrete avmchieves it's maximum strength on 28 days , Thad why concrete cylinders are tested after 28 days to check whether the concrete has achieved the required strength
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
how to compute slab reinforcements on step by step procedures??
What Reinforcements Are Used In The Process Of Prestressing?
Why are steel plates inserted inside bearings in elastomeric bearing?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
What is difference between engineering stress and true stress?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
How to calculate woden area in sft and Cft
How many mortar required for Brickwork of 1 Cu.m works??
The foundations are placed below ground level, to increase?
How to cal. The weight of hollow pipe?
how to calculate reinforcment in staircase cranked beam?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
how to find quantity of concrete in PCC M15