How can we change element of compile time array?Can we do so
Answer Posted / san
You cant change value in compile time array during run time.
You gotta change em in program source and recompile them.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is *place and *auto keyword in prtf ?plz explain
do you use message subfiles? What are the necessary keywords required coding a message subfile?
How can we override a file during runtime in rpg?
what are the key words you must use when using a subfile?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
How to write record if no field or the field are different in physical file in rpgle ?
can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com
How would display prime numbers using CL program?
What is the difference between iter and do?
How to handle duplicate error handling in RPG?
What is file identifier where we can use?
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
what is the difference between do while and do until?
what is kids-rpg?