Answer Posted / onkar bhardwaj
Normally three types:-
F1- third class
F2- 2nd class
F3- 1st class
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What is the general specifications of a bituminous pavement road?
What are the materials used in building a gravity dam?
about higyway engineering
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
what is right & short method of measurement of slab&beam
What is critical path method (c.p.m)?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
400 ku d/c clearess ketan hota hai?
All aptitude question of Bechtel
Why the finite element method is lower bound solution?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How do you convert wind speed into force?