Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the diffrence between mmwc and kg/cm2 for pressure
measurment when we are using mmwc and when kg/cm2 and why?????
?? what is the reason

Answer Posted / subodh

1 Kg/cm2(g) = ? mmWC(g).

is mmWC is always absolute?

Is This Answer Correct ?    15 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will you calibrate PID controller? explain with example.

2483


please send data bank of quetions answers on analytical instrumentation.

1927


Type of level transmitter commnly used in Procees area are the following. a.________________This type of level transmitter works as follows

2143


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2214


what is cems analyzer explain with principle and drawing ?

2450


Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent

2172


how pressurize drum calibrated ?

2102


hey any one got the papers of SAIL and HPCL plz do help me by posting them to my mail ID's naren07_87@yaho.co.in, surenarendra@gmail.com

1971


what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question

1984


use of split range ? where it is used ? in which control loop it is used ?

2008


If a warning lamp will operate with the ground circuit is bypassed with a jumper wire to ground, what should you check?

2156


what is output of FOUNDATION FIELD BUS transmitter

2199


I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID

2826


WHAT IS THE DIFF. BETWEEN SKIN TEMPERATURE AND PASSES TEMPERATURE..?

2576


What is the use of temprature compensation?

1215