Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the main purpose of line PT and bus PT?

Answer Posted / pardeep bathinda

1 Bus pt use for under / over voltage protection and measure for volt and synchronization time use for voltage matching
2 line pt use for income line voltage and protection line under and over voltage

Is This Answer Correct ?    6 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where is the need for short circuit test for 3 see is required and why? can you explain in brief with application

1946


What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?

2055


what is kvarh? Please define it With calculation General motors ?

1144


whether starting current is limited to rated current of motor through soft starting or it exceeds the rated current?

1593


Which material is used for the core of a transformer and why?

1096


what is the significance of tan&delta and how it performed in power transformer

1926


how to calculate the cable current ratingand and how much of distance the rating will be ok will the distance is incresed what the action we take

2123


how to control dc motor?

1906


what is interfacing in computer studies?

1761


in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?

2271


State kirchoff current law?

1075


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1975


how the testing of protection CT Testing done through Primary injection kit please describe in detail procedure...

2213


what is the maximum temperature rating of a thhn insulated conductor?

1831


What are hrc fuses and where it is used?

1173