.want to know the volume of water for 1.2.4 concert mixing ratio
Answer Posted / rajasekar
we want refer water cement ratio recommended by consultant.It varies from concrete member to member and importance of structure. Appx 30 lit per bag of cement.
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What are the different types of runners?
What is meant by Crystal Concrete?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what is the design procedure for building
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
how gradation of aggregates effect on slump of fresh concrete?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What will be weight of 0.5mm GI sheet per sq.ft?
what do you know that m20,m25
Will going from a 3-tap to 6-tap increase water pressure?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
please briefly explain calculating or estimating steel quantity for a RCC column?