Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is proportional &
what is proportional band

Answer Posted / morsli

Hi the gain equal the variation of the out put variable devide the variation of the in put variation.
the proportionel BAND is the reverse of gain .
PB =1/k*100%
In the controller we find the proportional band with percent %

If we want to adjust the correct value of proportional band for the proportional controller ,we have to decrease the proportional band ,till we have cycling in process ,means out put of controller ,and the correct value for operationg process is the double of the cretical or cycling proportional band.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is function of SCADA , and how is it work, explain with difination

2363


hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....

2592


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

2125


Why is the orifice tab provided?

1206


why we should maintain neutral earth voltage below 1V while calibration? why cant it be 1.2V or 2V

2427


how to tune siemens sipart electro pneumatic positioner..plz tel me..

2127


which type of filter gives the constant phase characteristics?

1922


what is sliding spool valves?

2225


TECHNICAL/ARTITUDE

2235


What is motion balance principle?

1166


the output of the common trasmitter protocol in qatar gas are the following

2011


what is the difference between active & reactive power?

2183


what is orfics working in main steam line. is it increase pressure, velocity of steam flow and dicrease steam flow rate. or any other

2176


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2169


can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?

4725