Answer Posted / sandma
there is no necessity of grounding in the ships.It works on d.c.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?
In Indian Household, generally we receive 220V AC single phase supply. But AC has 2 phases, +ve & -ve. So in +ve half cycle current is flowing...so what happens in the -ve half cycle?? Please illustrate.
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
prove that power consumed in 3 phase delta system is 3 times as compared to 3 phase star system
what is the circutor?why we use it ?
What is the main purpose of c.f.b.c.boiler
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
How do we find the rating of a transformer, if it got burnt badly.
At what speed 1 HP motor can run an electric car of weighing 400 kg?
what is the use of the puls transformer in UPS & how it works???????????
What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?
the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?
What is Electrical Grade Aluminum for Tubular BusBars. i am confused between 6063 and T6 or T5 and what is BS 2898 and BS 159?
In a voltage-controlled current source A A current booster is never used B The load is always floated C A stiff current source drives the load D The load current equals Isc
What is the maximum percentage voltage drop (vd%)for a motor control center