Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the Specific gravity of Fine and Coarse aggregate ?

Answer Posted / kiran lokhande

Specific Gravity of Fine aggregate is 2.70
and Specific Gravity of Course aggregate is 2.90

Is This Answer Correct ?    5 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the ingredient value of 40mm and 20mm aggregates?

2011


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

3351


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2876


How to find out kg per Sft ?

2289


What is construction mitigation management?

2328


What things architect have to take care of before starting any project?

1283


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2779


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

2198


what is the weight of 10mm,20mm,40mm aggregate

2451


what are the types of design? which type of method is used at what type of design & why?

2194


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2860


What is pre-stressed concrete?

1118


as per is code, what is the minimum content of opc and ppc cement for rcc structure

2272


Would you cause a 55-gallon drum of water to weigh more by climbing in?

1129


What is geopolymer based concrete?

2728