how can we design dia of
rainwater pipes ? plez explain
by using formula ?
Answer Posted / rafeez
Q= AXV
A = area in m2 T/4x d2
v = velocity m/s
q = discharge m3/s
we know about velocity of water and discharge of water
ex q =2 m3/s v= 1 m/s
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
how many shuttering material required for 1000 sq.m built up area.
How to hide dimensions in autocad?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how to tie 10 legged stirrups
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Why are steel plates inserted inside bearings in elastomeric bearing?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is binding spacing of the rebars at lapping zones.