Answer Posted / baskaran

During gas turbine load reduce time, HP superheater temperature going to high temperature at that time Attamperator using in between HP superheater 1 &2.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain how the third harmonic content of the magnetising current affects transformer design

2750


what is restricted earth fault explain in details

1605


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

1802


LAPT working in alternator / generator

2477


How do you consider that you can improve and what assistance do you need to achieve this

1309






why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2726


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

481


what does mean by kva rating

975


operation

1345


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2945


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1257


What is difference between secondary Air & Tertiary Air and Their use.?

1423


why do you consider yourself a suitable candidate for this position

6850


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1857


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1709