Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is meant by concrete joints?

Answer Posted / abhishek kumar

two type of concrete joints, contruction joints and functional joints
functional joints has two parts
first expansion
second contraction joint

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is relation between SPT N value and driving piles after conducting a soil test?

2195


how to calculate the scour depth

2948


How to activate isometric axes in cad?

1237


what do you know that m20,m25

1904


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1756


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2160


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6756


how much quantity of cement,sand and water required for 1 sq feet flooring work .

2524


how to shuttering is used in slab

1781


What is meant by scaffolding coefficient?

2690


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

2086


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2757


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

3202


I need to constructive work in amaraj batteries

1868


acceptance criteria for concrete works

2201