What is the difference between gray swr pipe & red swr pipe
Answer Posted / fz
Red below ground & grey above groud
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
sir please send me campus placement questions in civil engineering
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
What is the zero value in quantity surveying
What is thumb rule in quality and quantity estimation of a Residential building??
How can i display 5 asterisk and another 5 asterisk )?
what is the service corridor?
What are the responsibilities of a site manager?
How many bricks are there in 100cft?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
How to cal. The weight of hollow pipe?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
I what know about life time of frp tank plz explain about it specifications & other details
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!